• Home
  • About Us
    • About Us
    • Capabilities
    • Principals
    • Services & Solutions
  • Projects
    • Trumpets & Risers
    • Aeration Blower Pipe
    • WTP Silo Ladder Upgrade
    • Safety Barrier Panels
    • Reservoir Access Upgrade
  • Contact Us
  • More
    • Home
    • About Us
      • About Us
      • Capabilities
      • Principals
      • Services & Solutions
    • Projects
      • Trumpets & Risers
      • Aeration Blower Pipe
      • WTP Silo Ladder Upgrade
      • Safety Barrier Panels
      • Reservoir Access Upgrade
    • Contact Us
  • Home
  • About Us
    • About Us
    • Capabilities
    • Principals
    • Services & Solutions
  • Projects
    • Trumpets & Risers
    • Aeration Blower Pipe
    • WTP Silo Ladder Upgrade
    • Safety Barrier Panels
    • Reservoir Access Upgrade
  • Contact Us
Metal Fabrication

AERATION BLOWER PIPE | MORPETH, nsw

Scope | Challenges | Outcomes

Scope of Works:

  •  Fabricate DN450 stainless steel aeration pipe spools;
  •  Fabricate DN300 stainless steel aeration pipe spools;
  • Tie in/install new spools in to existing blower pipe & valves; - Install spools along aeration tanks & under  roadway; and
  • Work in with other contractors to complete installation. 


Challenges

  • Source large diameter stainless steel pipe to meet the project deadline;
  • Focus on flange orientation to line up with existing valves & outlets on aeration tanks;
  • Focus on safety for moving/installing of large diameter pipe;
  • Field fit & welding pipe spools to tie in with exiting outlets under roadway & in trenches; 
  • All welding/fabrication and test plans required to local utiity standards;
  • Pipe spool design changes for unforeseen clashes with underground services;
  • Testing & commissioning aeration pipelines after installation; and
  • All pipelines complete & online by local utiity deadline for normal plant operation. 


Outcome 

  • All works completed safely and to local utiity standard;
  • All fabrication & welding completed by qualified welders/fabricators;
  • Regular discussions with client for unforeseen design changes;
  • Future Group established mobile/site workshop to complete any pipe spool modifications to minimise lost time in transporting spool back to Future’s Cardiff workshop;
  • Pipe spool & flanges fitted correctly as per designs & utility specifications;
  • Commissioning & testing plan discussed and implemented in conjunction with head contractor/client;
  • Safe operation procedure created and discussed with all workers/contractors for installing large pipes;
  • Works completed on budget and before project deadline; and
  • Quality management systems that were put in place by Future Group met all requirements for the project. 



Job Description: 

Fabricate and install of Aeration Blower Pipe Work to Morpeth WWTW


Client: 

Pensar Water | Newcastle, NSW

The Process


    Copyright © 2023 Future Industrial Group - All Rights Reserved.

    • Services & Solutions
    • Trumpets & Risers
    • Aeration Blower Pipe
    • WTP Silo Ladder Upgrade
    • Safety Barrier Panels
    • Reservoir Access Upgrade
    • Contact Us

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept